B. ALBOYACI Et Al. , "Reducing the failures with adding glass insulators to composite insulators of 400 kV transmission line at high altitude," ENGINEERING FAILURE ANALYSIS , vol.141, 2022
ALBOYACI, B. Et Al. 2022. Reducing the failures with adding glass insulators to composite insulators of 400 kV transmission line at high altitude. ENGINEERING FAILURE ANALYSIS , vol.141 .
ALBOYACI, B., ÇINAR, M. A., Demirol, Y. B., & Uzar, M., (2022). Reducing the failures with adding glass insulators to composite insulators of 400 kV transmission line at high altitude. ENGINEERING FAILURE ANALYSIS , vol.141.
ALBOYACI, BORA Et Al. "Reducing the failures with adding glass insulators to composite insulators of 400 kV transmission line at high altitude," ENGINEERING FAILURE ANALYSIS , vol.141, 2022
ALBOYACI, BORA Et Al. "Reducing the failures with adding glass insulators to composite insulators of 400 kV transmission line at high altitude." ENGINEERING FAILURE ANALYSIS , vol.141, 2022
ALBOYACI, B. Et Al. (2022) . "Reducing the failures with adding glass insulators to composite insulators of 400 kV transmission line at high altitude." ENGINEERING FAILURE ANALYSIS , vol.141.
@article{article, author={BORA ALBOYACI Et Al. }, title={Reducing the failures with adding glass insulators to composite insulators of 400 kV transmission line at high altitude}, journal={ENGINEERING FAILURE ANALYSIS}, year=2022}